..:: Parsethylene kish co. does not have any representative in iran ,The Company`s products are sold only through the central office with an official Certificate ::..

Static Pipe

Static Pipe Bursting in the Heartland Allen Steele Company & MSA Professional Services Bursting in Wisconsin

 

Static Pipe

Static pipe bursting continues to establish itself as a preferred method of pipe rehabilitation and replacement in the United States and North America. Literally hundreds of thousands of feet of pipe has been replaced throughout the US in just the last few years utilizing this trenchless method. Allen Steele Company, Lake Delton, WI is a good example of an established contractor expanding its service offerings to include static pipe bursting. Recently, the contractor took on one of the largest pipe bursting projects ever completed in the middle of the country’s heartland, Wisconsin.


To burst and replace the over 20,000 lineal feet of 4-inch force sewer main the Allen Steele Company choose the Grundoburst 800G static pipe bursting system from trenchless equipment manufacturer TT Technologies, Aurora, Ill.
The project in Wisconsin was performed for the Ho-Chunk Nation and the Rainbow Casino. The casino is located in the town of Port Edwards about 5 miles southwest of the city of Nekoosa. According to Scott Chilson, Project Engineer, MSA Professional Services, Baraboo, WI, project planning and preliminary design began in 2003. The project included replacing approximately 24,000 lineal feet of 4-inch HDPE sewer force main with 8-inch HDPE. The design was completed during 2005-2006 and the project was bid in early summer of 2006.
Chilson said, “The project was bid by invitation only and the Allen Steele Company was the successful bidder. The firm has been performing HDD construction services for several years. However, this was the first pipe bursting project they have performed. MSA and Ho-Chunk contacted Bill Brennan, TT Technologies, for assistance using the trenchless static pipe bursting method.”
For the project, the Allen Steele Company utilized a Grundoburst 800 G static pipe bursting system from trenchless equipment manufacturer TT Technologies, Aurora, Ill.

 

Static Pipe

Contractor & Engineering Firm Background

The Allen Steele Company was founded in 1957. Since that time, Allen Steele and his company have earned an excellent reputation with owners and engineers as a premier underground and site utility contractor. The company specializes in excavating, site grade, municipal and commercial sewer and water, as well as underground cable installation services.
MSA Professional Services was founded in 1962. The company boasts a wide range of engineering, architectural and planning services for the municipal and government, transportation, real estate and development, and environmental sectors. Headquartered in Baraboo, Wisconsin, the company has twelve satellite offices in four states and has garnered a solid reputation for quality and vision.
Together MSA Professional Services and the Allen Steele Company completed one of the largest static bursting projects in the Upper Midwest.

Static Pipe Bursting

Crews utilized a specially designed quad cutter to split the existing 4-inch HDPE force main. The undersized main was replaced with 8-inch HDPE.
According to TT Technologies pipe bursting specialist Bill Brennan, static pipe bursting has established itself as a dependable trenchless pipe replacement method throughout the US. He said, “While pneumatic pipe bursting continues to be a favorite pipe bursting option, static pipe bursting has really become an attractive pipe replacement method. I think a lot has to do with the fact that there is a lot of static pipe bursting experience out there now. That may not have been the case 10 years ago, but now engineers and contractors are being exposed to the process all the time. And even new contractors can enter into projects with confidence because of collective static bursting experience that’s out there. The Allen Steele Company is a prime example of that taking on 20,000 feet their first time out with static bursting equipment. They’re also a highly skilled group.”
The static bursting process is simple, yet effective. Specially designed bladed rollers are pulled through an existing line by a hydraulically powered bursting unit. As the bladed rollers are pulled through, they split the host pipe. An expander attached to the rollers forces the fragmented pipe into the surrounding soil while simultaneously pulling in the new pipe, typically HDPE.
Patented Quicklock bursting rods are linked together not screwed together like traditional drill stems or other static systems. This system speeds the installation process as well as the breakdown procedure. The rods can be quickly removed one at a time at the exit pit as bursting is in operation. And while HDPE is commonly used, new techniques and technologies are allowing contractors a choice when it comes to product pipe. Other pipe materials that can be installed through static bursting include ductile iron, PVC, specially designed clay and even steel.”
According to Brennan recently there has been great success in utilizing other product pipe materials with the static bursting process. He said, “In many cases HDPE is the right choice for product pipe. However, in some situations it’s ductile iron, in another it’s PVC. Over the last several years, techniques have been developed to allow the use of a variety of product pipe options, like ductile iron and PVC, with static bursting. It provides contractors, engineers and municipalities a great deal of choice and flexibility when it comes to the Grundoburst static bursting method and further demonstrates the maturity of the process in the US market.”

Static Pipe

Project Background

To speed the bursting process crews would divide a 1,000-foot section of pipe into two bursting runs. By placing the Grundoburst unit in the middle of the two runs, crews were able to burst one section of pipe and feed the Quicklock rods into the next bursting run sim
ultaneously. So as one run was completed, crews simply rotated the bursting 180 degrees to burst from the other direction.
According to MSA, the Rainbow Casino and nearby businesses and residences had been served by an aging sanitary pump station and force main. The pump station and force main conveyed the wastewater to the Nekoosa Wastewater Treatment Plant. The city accepts the flows from the casino and other users. Growing concerns with the reliability and capacity of the existing pump station along with pending future expansion and development prompted the Ho-Chunk to consider action.
Chilson said, “MSA Professional Services evaluated the existing system and offered a recommendation. The outcome of the evaluation was to replace the pump station with a new facility and to increase the size and capacity of the existing force main. A site for the new pump station was readily available. However, the privately owned force main was located in the public right-of-way controlled by Wood County, the town of Port Edwards, and the city of Nekoosa.
During the preliminary design, MSA and Ho-Chunk contacted the county, town, and city to discuss the feasibility of the installation of another larger force main. The governing agencies granted the Ho-Chunk permission to install and operate in the public right-of-way. However, they expressed a desire that the construction be conducted in the method that would minimize surface disturbance.”
Based on that request, static pipe bursting became the method of choice for the project. According to Steele, the previous main installation project left a poor impression on the residents of the area. He said, “When the original 4-inch force main was installed, the contractor did not restore the roads, driveways and turf to the local resident’s satisfaction. MSA Professional Services considered the options of open cutting, directional boring and pipe bursting. Open cut was ruled out because of the public relations situation. MSA Professional Services and TT Technologies worked together to come up with the best approach to this project.” The final project design included approximately 20,000 lineal feet of static bursting and another 4,000 feet of HDD installation.

On The Job


Because of the significant upsize and sandy soil conditions, Bentonite lubrication was used. The Allen Steele crew utilized a Grundomudd DS 500 Bentonite mixing and delivery system, also from TT Technologies. During bursting runs a Bentonite slurry was pumped through a hose that ran inside of the new 8-inch HDPE. A hole was drilled near the lead end of the pipe and a Bentonite manifold was attached. This allowed the Bentonite slurry to be pumped during bursting operations.
In addition to running Bentonite during operations, a specially designed splitting head was used to split the existing HDPE. Brennan explained, “For this situation, we used a quad cutter instead of a standard bursting head to split the existing HDPE. Because the existing PE pipe was relatively new, the splitter was the best option.”

Bentonite lubrication was used because of the significant upsize and the sandy soil conditions in the area. A special Bentonite manifold was installed on the lead end of the pipe to delivery the lubricant.
According to Steele, for a typical run, the crew would choose a 1,000-ft section of pipe and divide it in half, placing the exit pit in the middle of the run and dig launch pits at either end of the 1,000-ft section. He said, “We used a 5-foot spreader bar on a 25-foot box for the exit pit, where the hydraulic bursting unit was placed. For the launch pits we were able to get by with an even smaller, 8- by 20-ft box. The existing 4-inch main ran between 6 and 7 feet deep in most areas.”
This approach helped speed up the bursting process and improve efficiency. First crews would feed the Quicklock bursting rods through the first 500-foot section of pipe from the exit pit to the launch pit. After the rods arrived at the launch pit, the splitting head, expander and fused HDPE were attached and pullback begins.
At this point, instead of removing the bursting rods one at a time at the exit pit during the pullback, they pass through the hydraulic bursting unit, connected, and are fed into the next 500-ft section of pipe. So as one run is completed, the rods are placed in the next section of pipe. All the crew needs to do is lift and turn the bursting unit 180 degrees and prepare for the next run.
Allen said, “The fusing of the pipe took place well prior to the actual bursting. Installing the trench box and maintaining the safety for the crew was probably the most time consuming aspect of the project. The actual pulling operation took between two and three hours per 500 feet. Plus, we were able to pull 500 plus [feet] per pull and we were able to make two pulls from each pit, which really helped speed things up. The crews had one week in particular, working nine-hour days, where they were doing 1,000 to 1,100 feet per day. During that one week period of time the boys put in over 6,000 feet of new pipe.”

Static Pipe

Project Review


Chilson said the project was challenging in numerous ways. He said, “The project was big in length at just under five miles. It also included a large upsize, increasing the force main two diametric sizes. We had to contend with a short construction schedule, plus coordinate and gain the trust of a new construction method by all the project stakeholders. The project itself was basically the construction of a private utility within a public right-of-way that crossed three separate jurisdictions. Physically, the main crossed a trout stream, two high-pressure crude oil pipelines, two county highways and a highly traveled county road. There was even a fiber optic communication line located above the existing force main. This project had a little bit of everything.”
According to Steele for a first bursting project this one left a positive impression on his crews. He said, “By the end of the project, the crews enjoyed it [the bursting process]. They got the system down pat. In the beginning they resisted. The crews were accustomed to open cut techniques. They’re very good at it. But now, we can see the benefits of static pipe bursting. We’ve done a 180 on it. In the right place, it’s the right way to go.”
Chilson said, “From the engineer’s perspective, the large number of stakeholders plus the numerous physical challenges related to this project style added to the long list of unknowns and risks. In the end though, the project was completed on schedule without any unforeseen situations. The project team, including the Allen Steele Company, TT Technologies, and MSA Professional Services, made this happen. The success of the project was due to a true team effort. The project would not have been possible without the trust the Ho-Chunk Nation extended to MSA in allowing the use of this progressive construction method and approach.”

Jim Schill
Technical Writer
Mankato, MN
Underground Construction, February 2007


Top categories

UAE 1: 00971 56 286 1414
H.Emami @ Parsethylene-kish.com
UAE 2: 00971 56 286 1515
Info @ Parsethylene-kish.com
IR : +9821 88 20 20 60
  Contact us
  Pars Ethylene Kish at a glance
  Pars Ethylene Kish, a symbol of capability and quality
  Mission and Vision
  Sale and its Strategies in Pars Ethylene Kish
  Reason for High Quality of Pars Ethylene Kish Products
  Quality Control Laboratory
  Guaranty & after sales service
  Reasons of paying attention to quality
  INSO Certificate
  Maintenance and storage of HDPE pipes
  Instructions for storing HDPE pipe against UV
  Polyethylene Joining Procedures
  Polyethylene Pipe
  HDPE pipes for gas supply
  HDPE Corrugated Pipes
  HDPE Single Wall Fittings
  HDPE Double Wall Fittings
  HDPE Electrofusion Fittings
  Cage fish farming
  Domestic Sewage Treatment
  Polyethylene Manholes
  Telecommunication manhole
  HDPE Fire Fighting Pipe
  HandBook of HDPE Pipe
  HDPE Pipe price list
  Price list of double-Layer Corrugated pipe
  FM Approval
  PDMS Catalogue
  HDPE Pipes in Power Plants
  HDPE Pipes in railway and urban rail
  HDPE Pipe in Mining
  HDPE Pipe in Airport
  HDPE Pipe in Conducting Agricultural Pesticides
  HDPE Pipe in drain
  HDPE Pipe in Landfills
  The Coating Materials Of Steel Pipes
  Cable Covering
  HDPE pipe in Ventilation
  HDPE Pipe in Ships
  HDPE Pipes in Floor Heating
  Gallery
  Polyethylene Manhole Sewage
  U-PVC Pipe
  Draining Pipe
  PEX Pipe
  Polyethylene drip irrigation tape
  PushFit System
  HDPE Dredging Pipe
  Polyethylene Welding
  Sewer Fittings
  Application of Polyethylene Manhole
  Polyethylene Tank
  PE Septic Tank
  PE Jersy Barrier
  Fire Sprinklers
  Composite Manhole Cover
  PE Valve Box
  HDPE Pipe in Sea Water
  Price of HDPE pipe
  Brochures & Catalogue
  Polyethylene Machinary
  Certificates
  Raw Material
  Borouge HDPE Pipe Systems
  Reference standards
  Standards for HDPE Pipe
  Technical Data
  Job Opportunities
  HSE Plan
  Welding Course Study
Quality Begins with Pars Ethylene Kish The new generation of parsethylene kish corrugated pipes PDMS Catalog Pars Ethylene Kish Polyethylene cage fish farming Domestic Sewage Treatment FM Approval Certificate Pars Ethylene Kish Isiri Certeficate of Parsethylene Kish 17025 Certificates Integrated Management System SGS Quality Managment System Raw Material of HDPE of Parsethylene Kish Reference standards of Polyethylene, PVC and polymer Handbook of Pars Ethylene Kish products Technical Certificate of Road, Housing and Urban Development Research Center Health Premission of Polyethylene pipefor water supply New Generation of Composite Cover Failure modes and mechanisms in cast iron pipe Case Studies Reference standards of PE, PVC and polymer Fun & Game Join us on FaceBook Follow Us on Telegram

Pars Ethylene kish does not have any representative in iran ,The Company`s products are sold only through the central office 

::
Copyright © 2007- 2018 Pars Ethylene Kish Co. :: All rights reserved :: Design & Development by: Pars Ethylene Kish ::