replacing water main

University of Wisconsin Campus Life Unaffected using
Pre-chlorinated Pipe Bursting to Replace Water Main


replacing water main

The University of Wisconsin System is one of the largest systems of public higher education in the country, serving more than 178,000 students each year with 26 campuses throughout the state. When replacing water and sewer infrastructure on University and College campuses, it is vital to reduce the impact of construction to the students, faculty and everyday life. When replacement is required, most campuses have a very small window during Holiday breaks or summer months when campus activity is reduced.
The University of Wisconsin-Platteville was founded in 1866. During the 1960s, the college experienced a period of rapid growth resulting in the construction of many new halls and a build out of its utility infrastructure. Many of the aging water mains across campus are in need of replacement, including the need to increase diameter to meet fire flow protection and increased demand. During a 3 week period in July, UW-Platteville had a small window to replace sections of water main that were located through the heart of campus.

replacing water main

The pipe bursting method is considered a “green” technology and assisted in reducing the environmental impact on the surroundings. Only surgical excavations were required along the project which helped reduce excavation and restoration by over 85% compared to traditional open trench. None of the historic trees, flower beds and mature landscaping were affected. The reduced excavations also helped to eliminate risks that can be associated with long open trenches as it was vital that students taking summer classes could move freely throughout the campus.
The efficiency of the method also attributed to the overall success as Murphy Pipeline crews av¬eraged replacing 460 feet per day. This production rate meant crews were only visible to each area of replacement for one day. The rapid installation and small footprint was a key element in minimizing the impact to faculty and student life.

source : www.pepipe.org


Top categories

UAE 1: 00971 56 286 1414
H.Emami @ Parsethylene-kish.com
UAE 2: 00971 56 286 1515
Info @ Parsethylene-kish.com
IR : +9821 88 20 20 60
  Contact us
  Pars Ethylene Kish at a glance
  Pars Ethylene Kish, a symbol of capability and quality
  Mission and Vision
  Sale and its Strategies in Pars Ethylene Kish
  Reason for High Quality of Pars Ethylene Kish Products
  Quality Control Laboratory
  Guaranty & after sales service
  Reasons of paying attention to quality
  INSO Certificate
  Maintenance and storage of HDPE pipes
  Instructions for storing HDPE pipe against UV
  Polyethylene Joining Procedures
  Polyethylene Pipe
  HDPE pipes for gas supply
  HDPE Corrugated Pipes
  HDPE Single Wall Fittings
  HDPE Double Wall Fittings
  HDPE Electrofusion Fittings
  Cage fish farming
  Domestic Sewage Treatment
  Polyethylene Manholes
  Telecommunication manhole
  HDPE Fire Fighting Pipe
  HandBook of HDPE Pipe
  HDPE Pipe price list
  Price list of double-Layer Corrugated pipe
  FM Approval
  PDMS Catalogue
  HDPE Pipes in Power Plants
  HDPE Pipes in railway and urban rail
  HDPE Pipe in Mining
  HDPE Pipe in Airport
  HDPE Pipe in Conducting Agricultural Pesticides
  HDPE Pipe in drain
  HDPE Pipe in Landfills
  The Coating Materials Of Steel Pipes
  Cable Covering
  HDPE pipe in Ventilation
  HDPE Pipe in Ships
  HDPE Pipes in Floor Heating
  Gallery
  Polyethylene Manhole Sewage
  U-PVC Pipe
  Draining Pipe
  PEX Pipe
  Polyethylene drip irrigation tape
  PushFit System
  HDPE Dredging Pipe
  Polyethylene Welding
  Sewer Fittings
  Application of Polyethylene Manhole
  Polyethylene Tank
  PE Septic Tank
  PE Jersy Barrier
  Fire Sprinklers
  Composite Manhole Cover
  PE Valve Box
  HDPE Pipe in Sea Water
  Price of HDPE pipe
  Brochures & Catalogue
  Polyethylene Machinary
  Certificates
  Raw Material
  Borouge HDPE Pipe Systems
  Reference standards
  Standards for HDPE Pipe
  Technical Data
  Job Opportunities
  HSE Plan
  Welding Course Study
Quality Begins with Pars Ethylene Kish The new generation of parsethylene kish corrugated pipes PDMS Catalog Pars Ethylene Kish Polyethylene cage fish farming Domestic Sewage Treatment FM Approval Certificate Pars Ethylene Kish Isiri Certeficate of Parsethylene Kish 17025 Certificates Integrated Management System SGS Quality Managment System Raw Material of HDPE of Parsethylene Kish Reference standards of Polyethylene, PVC and polymer Handbook of Pars Ethylene Kish products Technical Certificate of Road, Housing and Urban Development Research Center Health Premission of Polyethylene pipefor water supply New Generation of Composite Cover Failure modes and mechanisms in cast iron pipe Case Studies Reference standards of PE, PVC and polymer Fun & Game Join us on FaceBook Follow Us on Telegram

Pars Ethylene kish does not have any representative in iran ,The Company`s products are sold only through the central office 

::
Copyright © 2007- 2018 Pars Ethylene Kish Co. :: All rights reserved :: Design & Development by: Pars Ethylene Kish ::